POWER UP TESTING AND INITIALIZATION
When shipped from the factory, the TSU 600 is set to
factory default conditions. At the first application of
power, the unit automatically executes a memory self
test. A full self test can be run from the front panel,
and a pass code and unit ID may be set using the UTIL
menu.
Self Test
Upon a power-up, the LCD displays
Memory Test
Now Testing
and the Test LEDs are illuminated.
When the self test is completed with no failures
detected, the OK LED lights up
and the LCD momen-
tarily displays
All Tests Passed
. If a failure is de-
tected, a list of failures is displayed in the LCD win-
dow. The full self test procedure (invoked from the
front panel or T-Watch) consists of the following steps:
1.
Board level tests. Each of the TSU 600
boards contains an on board processor
which executes a series of tests checking the
circuitry on the board.
a. RAM tests; EPROM checksum.
b. DS0 map tests.
c. On board data path. Sending a known test
pattern through an on board loop.
2.
Unit level tests.
a.
Front panel LED verification.
b. Phase lock loop verify.
c.
Board-to-board interface test. A test pattern is
sent from the controller through a loopback on
all other boards and checked on the controller.
This verifies the data path, clocks, and control
signals.
Summary of Contents for TSU 600
Page 1: ...61200 076L2 1B July 1997 TSU 600 USER MANUAL Part Number 1200076L2 1200076L2 DC...
Page 4: ...Table of Contents...
Page 96: ...Chapter 3 Operation 84 TSU 600 User Manual 61200 076L2 1...
Page 118: ...Chapter 4 Example Operations 106 TSU 600 User Manual 61200 076L2 1...
Page 126: ...Appendix C System Configuration Charts 114 TSU 600 User Manual 61200 076L2 1...
Page 128: ...Appendix D TSU 600 System Messages 116 TSU 600 User Manual 61200 076L1 1...