50
Inner container and deployment handle
The reserve should be packed in a square shape to match the size of
the supplied inner container. The handle should be looped on to the
reserve inner container. When installing the reserve make sure that
this connection (handle to container) is at the side.
First lay the bridles and line bundles in the reserve compartment then
finally place the inner container in. The closure flaps of the inner con-
tainer should lie uppermost, facing the seatboard. The reserve handle
is fixed on the right hand side of the harness. It is easy to see and ea-
sy to reach. When closing the compartment make sure the yellow re-
taining cables run cleanly, so as to guarantee a correct deployment.
Lead the yellow cable from the reserve handle through the neoprene
sleeve provided. The reserve handle should sit on the side of the har-
ness as shown; it is then clearly visible, and easy to reach.
Caution: Never connect the inner container to the reserve
parachute.
Info: You can easily loop the deployment handle supplied to
all conventional reserve inner containers.
08354600_Advance_S 50
10.07.2008 10:36:11 Uhr
Summary of Contents for Success 2 Plus
Page 2: ...Edition 07 2008 08354600_Advance_Success2 2 10 07 2008 10 36 01 Uhr...
Page 4: ...4 08354600_Advance_Success2 4 10 07 2008 10 36 02 Uhr...
Page 34: ...34 08354600_Advance_Success2 34 10 07 2008 10 36 07 Uhr...
Page 53: ...53 08354600_Advance_Success2 53 10 07 2008 10 36 12 Uhr...
Page 62: ...62 08354600_Advance_Success2 62 10 07 2008 10 36 14 Uhr...
Page 99: ...08354600_Advance_Success2 99 10 07 2008 10 36 19 Uhr...