2.4.2
PM: Pilot Monitor’s Flame Sensitive Wavelength
The QUASAR M8100PM-EXP uses a single select filter allowing the electronics to amplify the IR
energy of interests over the background IR energy. This allows the Pilot Monitor to achieve high
sensitivity and dynamic range.
2.4.3
FM: Flare Monitor’s Flame Sensitive Wavelength
The QUASAR M8100FM-EXP uses a single select filter allowing the electronics to amplify the IR
energy of interests over the background IR energy. This allows the Flare Monitor to achieve high
sensitivity and dynamic range.
2.5
Quick Installation Procedure
This quick installation procedure may be used as a checklist if you are familiar with the
equipment. For complete instruction and safety precautions, refer to the appropriate sections of
this manual:
•
Appendix E: Engineering Drawing 613-816, Service Connections
•
Chapter 3, Mechanical Installation
•
Chapter 4, Electrical Installation
•
Chapter 10, Safety Assurances and Precautions
Warning:
Service personnel shall be qualified to install and service electrical
equipment designed for areas classified as hazardous. At no time should the cover be
removed unless power is switched off first. When it is necessary to service the
instrument with the power applied, ensure proper safe environmental conditions exist
and that such maintenance is authorized and pursuant to safe conditions. See
Chapter 10, Safety Assurances and Precautions
, for more information.
1.
Installation Sight Assessment
a.
Verify the location is within the instrument’s design capabilities and that the
field of view will yield acceptable performance. Refer to
Chapter 3, Mechanical
Installation
, for more information.
b.
Confirm the instrument’s input power and signal output configuration is as
expected.
2.
Mechanical - ensure the correct air requirements are met:
a.
View port purge
b.
Vortex cooler (if required)
3.
Focus the instrument on the target (adjust the lens).
4.
Electrical - (Reference:
Section
10.2, Electrical Service Protection
):
a.
Connect the instrument power:
i.
The power service type is marked on the Terminal Output PC Board;
verify that it corresponds to the service type being installed.
ii.
Separate the power wires from the signal wires by routing through
separate conduit ports.
iii.
Connect the service power to TB1 on the Terminal Output PC Board.