3
Mounting Bracket Installation
The AW-NCB4100(W) call box should be mounted
onto flat surface using the appropriate mounting
screws/hardware for the surface type. The mounting
bracket screw holes are designed to utilize a standard
#6 or #8 pan head screw. There are four available
mounting hole locations. The call box inserts at the top
of the mounting bracket and slides down to lock into
place. When installing the bracket, make sure the
mounting bracket release tab is at the bottom.
Installing AW-NCB4100(W) To Mounting Bracket
The call box is installed onto the mounting bracket from the top down. Line
up the back of the call box to the top of the bracket and slide the call box
downward. The call box will lock into place in the mounting bracket.
To remove the call box from the mounting bracket, press the lock release tab
and slide the call box up and out of the mounting bracket.
Pull Cord Installation
Install the appropriate length of pull cord to the call box pull cord pig tail located
at the bottom of the call box. The pull cord MUST be adjusted to be within 6
inches of the floor.
Install the call
box from the top
and slide down
until the locking
tab engages
Locking tab
Pull Cord
Pig Tail