Titan Central Chillers
Page: 35
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: service@AdvantageEngineering.com
compressors or fixed scroll compressors and hot gas bypass capacity
control, when the first dot and fourth dot are larger this indicates the
compressor is running and the capacity unloading feature is engaged.
Suction indicates the refrigerant suction pressure, sometimes referred to
as 'low' or 'evaporator' pressure.
Discharge indicates the refrigerant discharge pressure, sometimes
referred to as 'high' or 'head' pressure.
To Process indicates the process cooling fluid (water or water/glycol)
pressure.
D.
When the compressor is turned off, the instrument will wait 3 minutes
before turning it back on regardless of the To Process temperature or
Setpoint.
If a low pressure or optional low flow fault has occurred, the control
will attempt to turn the compressor back on after 3 minutes. If the fault
condition remians, the compressor will not restart and the control will
retry after 1 minute. The sequence will repeat 3 times then the system
will lock-out and the unit must be powered off/on to restart the unit.
If a high pressure fault occurs the fault must be acknowledged by
pressing the start button before the system will attempt to restart.
E.
Under normal conditions (no fault conditions, compressor has been off
for 3 minutes) the instrument will turn on the compressor when the To
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
S u c t i o n 1 5 1 P S I
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
D i s c h a r g e 2 8 5 P S I
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
T o P r o c e s s 4 4 P S I
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
C i r c u l a t i n g
50°F
To Process
S e t p o i n t : 5 0 ° F
O u t p u t s
■
• •
■
50°F
Summary of Contents for Titan
Page 2: ......
Page 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Page 24: ...Page 24 THIS PAGE INTENTIONALLY BLANK ...
Page 50: ...Page 50 THIS PAGE INTENTIONALLY BLANK ...
Page 58: ...Page 58 THIS PAGE INTENTIONALLY BLANK ...
Page 74: ...Page 74 THIS PAGE INTENTIONALLY BLANK ...
Page 94: ...END 2021 ADVANTAGE ENGINEERING INC RE 20210407 ...