BC-N4 Glycol Chiller
Page: 36
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: service@AdvantageEngineering.com
2.
Liquid line valve or suction valve on compressor is partially closed. Open
fully.
3.
Liquid line solenoid not opening fully or leaking during off cycle. Have the
solenoid repaired or replaced if defective by a refrigeration serviceman.
4.
Expansion valve plugged or inoperative. Check thermal bulb and capillary
tube for damage. Have repaired or replaced if defective by a refrigeration service
man.
4.5
COMPRESSOR SHUTS OFF ON INTERNAL OVERLOAD
A.
Control does not reset. Have compressor windings and internal solid state
safety control checked by a refrigeration serviceman. Have it repaired or replace
if defective.
4.6
LOW OR NO PROCESS PRESSURE OR WATER FLOW
A. Valves. Check if water valves are open.
B.
Pump. Check pump for correct rotation. Check pump suction for restriction.
Replace motor if defective.
C. Filters. Check filter in the chilled water circuit and clean if necessary.
D.
Pressure switch (or flow switch). Readjust or replace if defective.
E.
Fuses and wiring. Have electrician check the fuses and wiring.
4.7
COOLING CAPACITY INADEQUATE
A.
Low refrigerant charge. Check for adequate refrigerant charge (bubbles or
misty sight glass indicates low charge). If charge is low, have system checked for
leaks and recharged by a refrigeration serviceman.
B.
Hot-gas bypass valve stuck open. Have repaired or replace if defective by a
refrigeration serviceman.
C.
Expansion valve plugged or inoperative. Check thermal bulb and capillary
tube for damage. Have repaired or replaced if defective by a refrigeration
serviceman.
D.
Plugged filter. Check filter in chilled water circuit and clean.
E.
Air in system. Purge air.
Summary of Contents for BC-N4 Series
Page 2: ......
Page 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Page 20: ...Page 20 THIS PAGE INTENTIONALLY BLANK ...
Page 32: ...Page 32 THIS PAGE INTENTIONALLY BLANK ...
Page 48: ...Page 48 THIS PAGE INTENTIONALLY BLANK ...
Page 54: ...Page 54 THIS PAGE INTENTIONALLY BLANK ...
Page 62: ...Page 62 THIS PAGE INTENTIONALLY BLANK ...
Page 63: ...END 2016 ADVANTAGE ENGINEERING INC RE 09 27 2016 ...
Page 64: ......