GESTEK
Lab
Report No.: 0609083 Rev. 1
N0 3, Pau-Tou-Tsuo Valley, Chia-Pau Tsuen, Lin Kou Hsiang, Taipei County, Taiwan, R.O.C. Tel:886-2-2603-5321 Fax:886-2-2603-5325
Accredited Lab. Of BSMI, NEMKO, NVLAP
Page 36 of 59
Listed Lab. of AUSTEL, Commerce, FCC, VCCI
NVLAP Lab Code:200085-0
10.5 OPERATING CONDITIONS OF THE EUT
1. Setup the EUT and Test Equipment as shown on 10.3.
2. Power on the EUT. Acting performance checking program to allow EUT executing its usual
operation mode during test.
10.6 TEST PROCEDURE
A “combination wave” as specified in
IEC 61000-4-5: 1995 + A1: 2000
was applied to the EUT.
The amplitude was gradually increased using control software. Surges were initiated line synced.
One surge per polarity and voltage level was applied in common and differential mode to the EUT
at 0, 90, 180, 270, and 0 degree phase angles. The surges were applied at a rate of 1 surge per
minute. The EUT was monitored for any degradation of performance. The AC test was conducted
for differential mode at
0.5kV
&
1.0kV
and common mode at
0.5kV
&
1.0kV & 2.0kV
. All tests were
run in both the positive and negative polarity for differential and common modes.