background image

 

Installing the 2.5’ HDD                                                     

1

Take out the HDD rubbers and screws from the accessory 

box ,and push the rubbers into the hole on the bracket;

 

 

 

 

2

Install the 2.5’ HDD in the bracket with four screws.   

 

3

Fix the HDD and bracket in the chassis.

 

SATA port need be 

forward to the power. Connect and place the cables as the 
picture shows.   

Installing Express Modules                                                         

 

1

Release the 2 screws. Push the lower half of the baffle and 

take it out

 

 

 

2

Insert the express module into the case and tighten the 

screws.   

 

 

 
 
 
 
 
 
 

Installation 

 

Summary of Contents for FWA-3232

Page 1: ... i3 4340TE i3 4330TE Intel Pentium Processor G3420 G3320TE and Intel Celeron Processor G1820 G1820TE LGA1150 Chipset Intel C226 H81 PCH Memory Dual channel DDR3 1333 1066 MHz ECC Xeon processors only Un buffered memory up to 32GB PCI Express 1xPCIe x8 gen 3 1xPCIe x4 gen 2 for FH HL PCI e cards Network Connectivity NMC up to 2x NMC Modules with PCI e x8 gen 3 interfaces Ethernet 8 or 6 x Intel I21...

Page 2: ...s SFP GE Module Figure3 NMC 1004 2 ports SFP 10GE Module Support Advantech NMCs as the form shows NMCs Ethernet Controller IO Interface NMC 0107 Intel I350 AM4 x1 4 GbE LAN RJ 45 NMC 0108 Intel I350 AM4 x1 4 GbE LAN SFP NMC 0801 Intel 82580EB x2 8 GbE LAN RJ 45 NMC 0108 Intel I350 AM4 x1 4 GbE LAN SFP NMC 1004E Intel 82599ES x1 2 10G LAN SFP NMC 4001 Intel 82599ES x2 4 10G LAN SFP NMC 0804 Intel I...

Page 3: ...nd ease the CPU into place 4 Close the load plate and push the load lever back down until it engages the retention tab Installing the heatsink and air scoop 1 Take out the heatsink air scoop 2pcs of silvery screws and 4pcs of black screws Place the heatsink into air scoop and lock them with the 4pcs black screw as the picture shows 2 Put the air scoop and heatsink on the board Insert and tighten t...

Page 4: ...and insert them into the Riser Card 5 Fix 4 screws into the tapped hole signed as the yellow arrow Installing the 3 5 HDD 1 Take out the HDD rubbers and screws 6pcs each from the accessory box 2 Fix the rubbers on the HDD bracket as picture shows 3 Fix the 3 5 HDD on the bracket with the screws as below picture 4 Make the bracket which has attached HDD be set up onto the original location in the c...

Page 5: ...connect it as the picture shows Then connect the SATA power cable to HDD interface ...

Page 6: ... 2 5 HDD in the bracket with four screws 3 Fix the HDD and bracket in the chassis SATA port need be forward to the power Connect and place the cables as the picture shows Installing Express Modules 1 Release the 2 screws Push the lower half of the baffle and take it out 2 Insert the express module into the case and tighten the screws Installation ...

Page 7: ...ment 4 Connect power cables to the power source 5 Ensure correct polarity 6 Turn on the power source To Disconnect Power supply 1 Turn off DC power source and equipment 2 Disconnect the power cord from equipment 3 Remove the earthed cable from protective earthed terminal of the equipment For YH 5301K RTN is 36 60VDC is For DM1Y2 5300V2H The board has a number of jumpers that allow you to configure...

Page 8: ... 2 3 WHEN BMC LOADED BMC_DETECT CHANGE TO 0 UART1 SWITCHED TO SOL Default setting 1 2 Jumper Short ATX12V1 Pins Function 1 GND 2 GND 3 12V 4 12V ATXPWR1 Pins Function 1 3 3V 2 3 3V 3 GND 4 5V 5 GND 6 5V 7 GND 8 POK 9 5VSB 10 12V 11 12V 12 3 3V 13 3 3V 14 12V 15 GND 16 PSON 17 GND 18 GND 19 GND 20 5V 21 5V 22 5V 23 5V 24 GND Jumper and Connectors ...

Page 9: ... GND 8 GND 9 GND 10 Key LPC1 Pins Function 1 LPC_FRAME 2 GND 3 LAD0 4 CLK 5 LAD1 6 SERIRQ 7 LAD2 8 RESET 9 LAD3 10 V3 3 SYSFAN1 SYSFAN4 Pins Function 1 GND 2 Power 3 FANIN 4 PWM VGA1 Pins Function 1 R 2 VCC 3 G 4 9 11 13 15 GND 5 B 6 7 NC 8 DDAT Jumper and Connectors ...

Page 10: ...10 HS 12 VS 14 DCLK 16 GND_V JTAG1 Pins Function 1 JTAG_TCK 2 VCC3 3 JTAG_TMS 4 GND 5 JTAG_TDI 6 GND 7 JTAG_TDO 8 GND 9 JTAG_RST 10 NC ...

Page 11: ...KBMS1 Pins Function 1 MSCK 2 V5_SB 3 GND 4 MSDT 5 KBDT 6 KBCK GPIO1 Pins Function 1 GPIO0 2 GPIO4 3 GPIO1 4 GPIO5 5 GPIO2 6 GPIO6 7 GPIO3 8 GPIO7 9 VCC 10 GND Jumper and Connectors ...

Page 12: ... Software List Windows Server2008 R2 64bit Windows 7 Ultimate English 32 bit Red Hat Enterprise 6 1 32bit 64bit Software Installation ...

Page 13: ...Board Placement ...

Page 14: ... Never pour any liquid into ventilation openings This could cause fire or electrical shock 14 Never open the equipment For safety reasons the equipment should be opened only by qualified service personnel 15 If any of the following situations arises get the equipment checked by service personnel a The power cord or plug is damaged b Liquid has penetrated into the equipment c The equipment has been...

Page 15: ...ectric charges As a safety precaution use a grounding wrist strap at all times Place all electronic components on a static dissipative surface or in a static shielded bag when they are not in the chassis 20 CAUTION Any unverified component could cause unexpected damage To ensure the correct installation please always use the components ex screws provided with the accessory box ...

Page 16: ...f air flow required for safe operation of the equipment is not compromised C Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading D Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on over...

Reviews: