52
www.advantech.com
Low Delay
– it means after 30 seconds delay from receiving of Battery Voltage LOW signal,
EC controller will send a shutdown event to make system start shutdown process.
Figure 6.9 Low hard delay
Low Hard Delay
– it means after 60 seconds from Low Voltage shutdown event, EC controller
will force power cut off at the same time
Figure 6.9 Battery voltage Threshold level setting
You could set the LOW battery voltage value by changing level 0 to 65. For example, if you’re
using 12V battery, and you set level as 50, it means the LOW battery voltage value is 10.147 +
50 x 0.0146 = 10.877 V.
Checks which source you’re connecting. DC supply or 12V or 24V battery.
Figure 6.9 check 12 or 24 battery
Check the ignition signal and see if it’s ON or OFF.
C. Read current status
The buttons which indicates by red squares can READ the current status of the system.
TREK-550 User Manual
22
Summary of Contents for TREK-550
Page 1: ...User Manual TREK 550 Computing Box ...
Page 20: ... ...
Page 36: ...5 9 LED indicator TREK 550 User Manual 22 ...
Page 48: ...53 www advantech com Figure 6 9 Read the value D Set the value ...
Page 55: ...60 www advantech com TREK 303 Specification TREK 303 demo SW application program Figure 6 17 ...
Page 57: ......
Page 58: ...TREK TREKͲ Dipol Comb K 550 A2 30 bo Antenna 3 User 4 44 ...