SETUP
Unpack the tent from the storage bag and identify each part.
STEP 1
Unroll and lay the outer tent out in the required position. Peg each anchor
point (1) of the groundsheet (there are 10 in total). Ensure that you tension the
groundsheet between the pegs to keep shape. You may need to re-peg later.
Inflate valve - this valve is used to inflate the air poles.
Deflate valve - this valve deflate the air poles.
Air tube valve - this valve provides an air tight connection between the valve
unit and the air pole. NOTE: the air tube valve should always be kept fastened.
AIR VALVES
There are 3 inflation valves on this tent. Each valve has 3 parts (2). All valves are
clockwise to tighten and anti-clockwise to loosen.
3
Pegs should be driven into the
ground at a 45°angle away from
the pegging point.
(1)
(2)
Air tube valve
Inflate valve
Deflate valve