26
N°: Action:
N°: Action:
N°: Action:
04
Cover the kit by the work plan
05
Air supply connection
06
Connect the comand
Connecting the fresh air inlet funnel is
Mandatory (d 100 mm)
N°: Action:
N°: Action:
N°: Action:
01
Unpacking
02
realize a cut in dimensions
03
Install the kit in the cut
Check that the product matches the
310 x 326 mm
product below
Product Integrttion
Inattlilittion by embedding
N°: Action:
07
Electrical connection
make the electrical connections according
to indications.
Inattlilittion in worktop> 20mm
If the worktop thickneaa ia auperior thtn 20 mm, you muat mtke t diaburaement in your worktop ao ta to ob-
ttin t thickneaa of 20mm. Put inaerta in thia diaburaed on which you wilili be tblie to fix the frtme of the pro-
duct.