background image

Operating Instructions for Pressure 
Transducers ADZ-SML Ex Zone2/22 

 

 

© ADZ NAGANO GmbH. All rights reserved, expressly including, without limitation, the rights of translation, of adaptation to 

other languages, of reproduction by way of abstracts, photocopies, microfilms, Xerox and similar methods, electronic 
processing (storage, reproduction and the like), and of rearranging the contents. 

Page 2 of 2 

ADZ NAGANO GmbH 

Bergener Ring 43, 01458 Ottendorf-Okrilla / Germany 

 

4  Installation 

 

4.1  Mechanical / pneumatic / hydraulic 

-

 

Screw the electronic pressure transmitter into the pressure connection provided using an open-jaw 
spanner, with a tightening torque of in the datasheet allowed value. 

-

 

To seal the system, use a standard seal with the appropriate dimensions. 

 

4.2  Electrical 

-

 

All wiring should conform to local codes and must be carried out by authorised personal only. 
Keep high and low voltage wiring separated. For applications in critical industrial environment use 
special cables. 

-

 

Observe without fail the connecting information – labelled on the transmitter or laid down in the 
operating instructions – while connecting the pressure transmitter. 

-

 

Ensure that the cables routed without crushing. 

-

 

Electricity supply and wirings must be enough for the demands for the ex-protection. 
 

 

4.3  Grounding 

-

 

At the installation the housing have to connect to ground according EN 60079-14, Section 6.3. 

 

5  Maintenance 

-

 

The transducer do not have parts for maintenance 

-

 

Do not open the housing!  

 
 
 
 

 INSTALLATIONSANLEITUNG ADZ-SML_EX_ZONE2_GB-T6-01.DOCX 
 7 February 2017 

 

Reviews: