3
:: Table of Contents
:: Notes
This symbols indicates a
special note or instruction
in the manual.
!
There is a 1:1 hardware foldout page in the back
of the manual. To check the size of a part, line
up your hardare with the correct drawing until
you find the exact size. Each part in the foldout
has a number assigned to it for ordering
replacement parts.
1....................Cover
2....................Introduction
3....................Table of Contents
4....................Front / Rear Differential Build
5....................Front Gearbox Build
6....................Rear Gearbox Build
7 - 8..............Steering and Center Battery
Brace Build / Install
8 - 9..............Front End Build
9....................Rear End Build
10.................Slipper Build
11..................Center Bulkhead Mounts
11.................Front Top Deck Build
11-12..........Rear Top Deck Build
13.................Turnbuckles Build
13.................Front CVA Build
13-14..........Front Suspension Build
15.................Rear CVA Build
15 - 16.......Rear Suspension Build
16-17..........Rear Anti-Roll Bar Build
17.................Battery Tray and Side Body
Mounts Build
18 - 19........Shocks Build
19 - 20........Servo Build
20.................Electronics Install
21 - 22........Body, Wheel, Tires Install
23 - 24.........Tuning Tips
25-33.........Catalog
34.................Notes
35.................Setup Sheet “Kit Setup”
36.................1:1 Hardware “Fold Out”
37.................Setup Sheet “Blank”
38.................Back Cover
Associated Electrics, Inc.
26021 Commercentre Dr.
Lake Forest, CA 92630
http://www.TeamAssociated.com · http://www.RC10.com · http://twitter.com/Team_Associated · http://bit.ly/AEonFacebook
Customer Service
Tel: 949.544.7500
Fax: 949.544.7501
Summary of Contents for B44.1
Page 1: ...9 10 ...
Page 34: ...34 Notes ...