(1-10kVA) UPS IST3
User Manual
4 Operation and Maintenance
33
----End
4.2.2 6kVA(L)/ 10kVA(/B) /10kVA(S)
Step 1
Switch on the mains breaker, bypass breaker and battery breaker.
Step 2
Press "ON" button on the panel for 1s to start UPS.
Step 3
About 10s later, if the UPS works steadily, start loads, such as PC, etc.
Start load with the sequence that "high power device
→
small power device", which is to avoid overload
protection when starting high power device.
----End
4.3 Shutdown Operation
4.3.1 1kVA(L)/2kVA (L)/3kVA (L)
Step 1
Close load and keep UPS running without load for about10min to exhaust heat.
Step 2
Press "OFF" button on the panel for 1s.
Step 3
Unplug mains socket.
----End
4.3.2 6kVA (L)/10kVA (/B) /10kVA(S)
Step 1
Close load and keep UPS running without load for about10min to exhaust heat.
Step 2
Press "OFF" button on the panel for 1s.
Step 3
Switch off the battery breaker, bypass breaker and mains breaker.
----End
Summary of Contents for IST3 Series
Page 1: ...UPS IST3 1 10kVA Series User Manual www aecups com ...
Page 2: ......