3 Installation
IST6
Series (200K-600K) Modular UPS
User Manual
40
All rights reserved ©
Allis Electric
Co., Ltd.
Step 2
Drill 4 holes (hole diameter is
φ
13) by hammer drill according to the bottom installation hole size (as
shown in Figure3-10, Figure3-11).
If the UPS is installed on U-steel, drill 4 hole (hole diameter is
φ
14) on the U-steel directly, and then
Figure3-10
Bottom size of
IST6-
200,
IST6
-
300
(unit: mm)
Figure3-11
Bottom size of
IST6400
,
IST6500
,
IST6600
(unit: mm)
Step 3
Install expansion bolts. The structure and installation for the expansion bolt is as shown in
Summary of Contents for IST6
Page 1: ...UPS IST6 200 600kVA Series User Manual www aecups com ...
Page 123: ......