UPS IST7 Series (60K-200K)
User Manual
3 Installation
43
The installation tools should be with isolated operation, which is to avoid electric shock.
3.2.2 Installation Environment
Do not install the UPS in the place where exceeds the provision of technology index
(temperature: -5
℃
~40
℃
, relative humidity: 0
%
~95
%
).
It is strictly prohibit installing the UPS in the environment with metal conductive dust.
Do not install the UPS in the open air, and the installation environment should meet the provision
requirements.
Basic requirements for power supply:
−
Grounding preparation. Ensure that the grounding terminal is OK and the voltage between
neutral wire and grounding wire should not exceed 5V.
−
Before installation, please ensure that the AC input voltage and mains input wire capacity meet
the UPS requirements. And considering if there has current-carrying capacity descending
caused by wire aging.
−
The mains input voltage range of the UPS is 80VAC-280VAC. The mains capacity should be
greater than the max. input power of the UPS.
−
The selected switch should not with leakage current protection.
The installation environment of the UPS should be with good ventilation, and far away from
water source, heat source and inflammable and explosive objects. Avoid installing the UPS in the
place where has direct sunshine, dust, volatile gas, corrosive objects or high salt.
The UPS is just suitable for using below 2000m. If the altitude exceed 2000m, it needs to
decrease the rated power according to GB/T7260.3-2003 and IEC 62477-1 to use.
Summary of Contents for IST7 Series
Page 1: ...UPS IST7 60 200kVA Series User Manual www aecups com ...
Page 2: ......