3 Installation
UPS IST7 Series (60K-200K)
User Manual
48
Figure3-5
Manual forklift
When lifting, pay attention to the balance and stable of the UPS.
During moving, keep the UPS vertical and do not put down or uplift suddenly.
3.3.2 Unpacking
Step 1
Check if the package appearance is in good condition and if there is any damage caused by
transportation. If damaged, please inform the carrier immediately.
Step 2
Transport the UPS to assigned site.
To avoid tilting during transportation, keep the forklift arm exceeding the wooden bracket.
Step 3
Unpack the external package, remove the foam pad and plastic bag, and take out the accessories.
Step 4
Check the UPS.
Inspect the appearance of the UPS and check if there has any damage caused by transportation. If
any damage, please inform the carrier immediately.
Compare with the packing list and check if the accessories mode is complete and proper. If the
accessories lack or model wrong, please take note and contact the our company or local agency
of our company.
Step 5
Loosen the fasten bolts.
IST7-60, IST7-100, IST7-120
Summary of Contents for IST7 Series
Page 1: ...UPS IST7 60 200kVA Series User Manual www aecups com ...
Page 2: ......