2 Overview
11
30kVA-40kVA
(30kVA-40kVA) UPS and distribution module has 2 kinds of copper bar, as shown inTable2-3.
Connect the wiring terminal of the UPS or distribution module with the copper bar according
to needs. The copper bar for short connect with the three phase bypass input terminal and
three phase output terminal only for 31 mode UPS.
Table2-3
Copper bar illustration
Copper bar No. Illustration
Sketch map
1#
3PIN copper bar
2#
3PIN copper bar
The installation position of the UPS main and power distribution module is as shown
inFigure2-7, Figure2-8.
Figure2-7
Installation 31 mode copper bar position of 30kVA-40kVA UPS
Summary of Contents for IST9
Page 1: ...l un I Jet _________ __ AEC IST9 1 0 20 https www uni jet com catalog ibp on line ibp aec ist9...
Page 2: ...UPS IST9 10 20 kVA User Manual...
Page 3: ......
Page 9: ......
Page 52: ...3 Installation 43 Figure3 29 Diagram of 33 mode parallel system wiring of 10kVA 20kVA UPS...
Page 54: ...3 Installation 45 Figure3 31 Diagram of 33 mode parallel system wiring of 30kVA 40kVA UPS...
Page 82: ......