3 Installation
30
Figure3-9
Install angle iron
Do not transport the UPS, battery box or power distribution module by angle iron.
The front panel can be dismantled front, during transporting, do not make it bear any force.
The device needs to be transported by two or more people.
Step 2
Push the UPS into the cabinet, and fasten it by screws, as shown in Figure3-10.
Figure3-10
Fasten the UPS
The battery box is heavy, when installing, the battery box must be installed from bottom and
down below the UPS.
----End