3 Installation
42
Step 5
Fix with the flat head screws, as shown in Figure3-28.
Figure3-28
Fix with the flat head screws
----End
3.4.8 Wiring of Parallel System
Step 1
Install the battery and UPS of parallel system separately according to
3.3 Mechanical
Installation
.
Step 2
Connect the wires of input, output, battery and grounding in parallel system on the basis of
Figure3-29, Figure3-30, Figure3-31 or Figure3-32.
10kVA-20kVA