4 Screen Operation
56
There are four next-level pages on the function set page, and the page display includes:
mode set, ECO set, battery test and else set four items, as shown in Figure4-14.
The following is to take the battery test page as an example, explain the three-level page
setting method, the rest of the page setting method is the same, will not repeat the story.
On the battery test page, you can select the options by short pressing the up/down page
button, and after selecting "Standard Test", you can enter the settings for the standard test by
short pressing the function button, at which point the standard test option "Off" flashes;
The on/off option switch can be performed for the standard test, and after adjusting to the
specific option, the standard test can be completed by short pressing the function button.
Because the current three battery tests cannot be performed at the same time, when one
battery test is set to on, the options for the other two battery tests automatically appear to be
off. In addition, since the discharge time setting is only available under the timing test
conditions, when the timing test is set to off, the discharge time item is not displayed.
Figure4-14
Details of function setting page
1.
Battery test settings: Standard test is that UPS return to the electrolytic inversion after turning to
battery inverter for 10s at power-on state, and the depth test is that UPS to go to battery inversion
until the battery discharges to the under-voltage alarm, and then returns to the main power
inverter.
Summary of Contents for IST9
Page 1: ...l un I Jet _________ __ AEC IST9 1 0 20 https www uni jet com catalog ibp on line ibp aec ist9...
Page 2: ...UPS IST9 10 20 kVA User Manual...
Page 3: ......
Page 9: ......
Page 52: ...3 Installation 43 Figure3 29 Diagram of 33 mode parallel system wiring of 10kVA 20kVA UPS...
Page 54: ...3 Installation 45 Figure3 31 Diagram of 33 mode parallel system wiring of 30kVA 40kVA UPS...
Page 82: ......