background image

Page 8

PS QuarterHorse Series Chillers

1-4 Available Options

PS Series chillers are available with options that tailor the unit to your requirements.
Some are factory installed, some can be retrofitted in the field. Consult your local
Application Engineering  Sales Representative. Some of these options are:

Power Cord

A 6 foot (1.8 m) power cord is available to speed PS installation.

Feet

Four leveling feet are mounted to the base of the PS unit.

1-5 Uncrating Your New Chiller

PS Series chillers are shipped mounted on a skid, enclosed in a plastic wrapper, and
open crated on all four sides and top.

;

 

Pry the crating away from the skid and remove. Use a pry bar to remove the
blocks securing the unit to the skid.

;

 

Lift the unit off the skid with a fork truck. Insert forks between skid and chiller
from the side until they protrude beyond the opposite side of the unit. The forks
must be equidistant from the center line of the unit and the unit must be balanced
on the forks.

;

 

Lift slowly and only high enough to clear the skid. Use a pry bar if necessary to
remove the skid from the unit.

;

 

Lower slowly. The unit will land on its feet or casters and can be moved into
position.

Summary of Contents for QuarterHorse Series 0.25 Portable Chiller PS-025

Page 1: ...PS 025 QuarterHorse Series 0 25 hp Portable Chiller Operation and Installation Manual...

Page 2: ...neering is committed to a continuing program of product improvement Specifications appearance and dimensions described in this manual are subject to change without notice Copyright AEC Application Eng...

Page 3: ...e working on equipment It is a good idea to remove the fuses and carry them with you Make sure the chiller is properly GROUNDED before switching power on When welding or brazing in or around this equi...

Page 4: ...ur New Chiller 1 6 In the Event of Shipping Damages 1 7 If the Shipment is Not Complete 1 8 If the Shipment is Incorrect 1 9 Returns 2 Chiller Installation 11 2 1 Electrical Connections 2 2 Process Wa...

Page 5: ...ts 17 4 1 Introduction 4 2 PS Pre Startup Checklist 4 3 PS Startup Checklist 5 Microprocessor Control 19 5 1 Introduction 5 2 Setting the Process Water Temperature 5 3 Power Switch 6 Routine Maintenan...

Page 6: ...Page 6 PS QuarterHorse Series Chillers Charts and Figures 1 PS050A Process Pump Curves 10 2 PS Series Chiller Specifications 10 3 Ethylene Glycol Curve 13 4 Overhead Piping 14...

Page 7: ...Necessary Documents The following documents are necessary for the operation installation and maintenance PS Series Chillers Additional copies are available from Application Engineering Familiarize th...

Page 8: ...s chillers are shipped mounted on a skid enclosed in a plastic wrapper and open crated on all four sides and top Pry the crating away from the skid and remove Use a pry bar to remove the blocks securi...

Page 9: ...original Bill of Lading is attached to our original invoice If the shipment was prepaid write us for a receipted transportation bill 1 7 If the Shipment is Not Complete Check the packing list The appa...

Page 10: ...6 13 6 15 1 4 0 4 4 16 7 4 8 18 2 Do not extrapolate pump curves Figure 2 PS Series Chiller Specifications PS Quarter Horse Series Cap 65 F lwt 90 F ambient Nominal chilled water Compressor Process c...

Page 11: ...illed water connections to the process must be of adequate size See Figure 4 on Page 14 for sizing recommendations The largest possible openings and passages should be provided for the flow of chilled...

Page 12: ...t air or fume exhausts will be drawn into the condenser Air cooled condensers must be cleaned frequently Neglect reduces capacity increases operating costs and leads to possible chiller failure See Ch...

Page 13: ...the side panel then remove the bushing installed on the top of the tank Install a pipe nipple and tee to the coupling on top of the tank Use one side of the tee for the vent line and the other side fo...

Page 14: ...drains into the reservoir To prevent this install a check valve in the unit TO PROCESS line and a vacuum breaker at the high point of the return FROM PROCESS line See Figure 4 below for more informati...

Page 15: ...reservoir tank The process water is pumped through the evaporator where it is cooled The coolant flows to the process and returns to repeat the cycle A chilled water bypass assembly between the supply...

Page 16: ...Page 16 PS QuarterHorse Series Chillers Notes...

Page 17: ...PS 025 QuarterHorse Series 0 25 hp Portable Chiller Operation and Installation Manual...

Page 18: ...Page 18 PS QuarterHorse Series Chillers Notes...

Page 19: ...e from its mounting housing It is factory set and adjusted no field adjustment to the internal controls is necessary 5 2 Setting the Process Water Temperature Press and hold the star key While holding...

Page 20: ...Page 20 PS QuarterHorse Series Chillers Notes...

Page 21: ...re to do so may result in dislodging the bearing grease retainer eventually causing bearing failure Compressors are hermetically sealed no oiling is required 6 2 Condenser Maintenance Dirty condenser...

Page 22: ...Page 22 PS QuarterHorse Series Chillers Notes...

Page 23: ...on Page 13 for more information Pump pressure is low see pump curve Check for foreign matter Clean the system Pump pressure is too high Restricted water flow Check for partially closed valves etc Be s...

Page 24: ...Page 24 PS QuarterHorse Series Chillers Service Notes...

Page 25: ...PS QuarterHorse Series Chillers Page 25 Service Notes...

Page 26: ...5pm CST call 847 439 5655 AEC Application Engineering has a qualified service department ready to help Service contracts are available for most AEC Application Engineering products Sales Department Ca...

Page 27: ...express authorization If the serial number has been defaced or removed from the component the warranty on that component is void Defective parts become the property of the warrantor and are to be ret...

Page 28: ...801 AEC Drive Wood Dale IL 60191 1198 USA 630 595 1060 Fax 630 595 6641 http www aecinternet com...

Reviews: