UPS IST7 (10KVA-40KVA)
User Manual
3 Installation
21
3 Installation
3.1 Announcements
The installation tools should be with isolated operation, which is to avoid electric shock.
There exist high-voltage in wiring end, please ensure that the wiring terminal with no
electricity, and then the wire connection can be done.
Place the UPS flat on the ground, avoid tilt and uneven ground.
Do NOT place goods or sit on the UPS.
3.2 Installation Preparation
3.2.1 Install Environment
The installation environment of the UPS should be with good ventilation, and far away from
water source, heat source and inflammable and explosive objects. Avoid installing the UPS
in the place where has direct sunshine, dust, volatile gas, corrosive objects or high salt.
3.2.2 Install Space
The installation site should be with enough space to place the device. Maintain a clearance
of at least 300mm from rear panel of the UPS to the wall or other device.
3.2.3 Select Breaker & Wires
The selecting for AC input and output wire, DC input wire and corresponding breakers needs
to be judged by the UPS's max. steady state phase current.
UPS max. steady state phase current
Type
10KVA
15KVA
20KVA
33
mode
31
mode
11
mode
33
mode
31
mode
11
mode
33
mode
31
mode
11
mode
AC input (A)
19.5
19.5
58.6
27.5
27.5
82.5
35.5
35.5
106.4