UPS IST7 (10KVA-40KVA)
User Manual
4 Touch Screen Operation
55
Item
Settable value
Temperature compensation coefficient (mV/
℃
) 0~5.0
Battery charge current (A)
10kVA-20kVA: 1.0~10.0;
30kVA-40kVA: 1.0~20.0
Force equalizing charge
On
Click number input box, it will display the input range of setting value at the top of the input
keyboard. When the setting exceeds the range, the setting will be invalid. After setting, click
"
" button to save the setting. Successful setting/unsuccessful setting mark is the
same as that of system management.
4.5.2 Battery Test Page
Battery test includes standard test and depth test and the battery test also can be canceled.
The page shows the test status, battery current, consumed capacity and test time.
Battery test page
4.5.3 Dry Contact Page
In setting manage page, click Dry Contact icon, it will enter dry contact setting page.
The dry contact setting is the same, below we take dry contact 1 as an example to illustrate.