5
Description of the Hob
Installation
Fig. 1
Any gas installation must be carried out by a registered CORGI installer, and in
accordance with existing rules and regulations.
The relevant instructions are to be found in the second section of this manual.
Please, ensure that, once the hob is installed, it is easily accessible for the engineer in the
event of a breakdown.
WHEN THE HOB IS FIRST INSTALLED
Once the hob has been installed, it is important to remove any protective materials, which
were put on in the factory.
2
4
5
2
1
3
6
1.
Hob Top
2.
Semi-rapid burner
3.
Auxiliary burner
4.
Rapid burner
5.
Ultra-rapid burner (triple crown)
6.
Control knobs