IST Series UPS (10kVA-200kVA)
User Manual
3 Installation
37
Figure3-13
Size of 160kVA, 200kVA
Step 2
Drill 4 holes ofΦ13 by hammer drill according to the installation size of pedestal (as shown in
Figure3-14).
Figure3-14
Bottom installation size (bottom view of pedestal)
Step 3
Install 4 expansion bolts M12 into the installation holes. The structure and installation of the
expansion bolt is as shown in Figure3-15.