- 7 / 50 -
BN 09 2671/01/01
3 INSTALLATION
The system is delivered as shown hereafter.
Natural cooling cabinet
Forced cooling cabinet
The equipment is fixed onto a pallet.
3.1 HANDLING
The equipment must be handled with care, always in a vertical position. Labels on the outside of the package show
the top and bottom.
CAUTION:
The transport of the system can be performed as follows:
-
on pallet,
-
by crane (in presence of lifting eye bolts),
-
by forklift truck.