Assembling
At
reassembling
nel'l expansion
bolts
are
mandatory.
An assembly
instruction
is with the
expansion
bolts.
Install
new exp:msion
bolts
into
the
flange
of
the
chamber
porcelain
until
':he dimension
A is
reached.
If
necessary,
in:itall
new retaining
bolts.
-
Place
the
fixed
contact
in the
chamber
porcelain
and fasten
with
two
retaining
bllts.
Use
nuti
(1.10.08)
without
compression
sleeves
(1.10.07':"
Tighten
with
75 Nm. It
could
be necessary
to
use
additional
wilshers
(1.10.06).
Put
the
metal
spacers
(1.10.02)
on the
expansion
bolts,
grease
threads
wi th
Mo
i
ykote
grease
BR 2 plus
and
tighten
the
nuts
(1-.10.03)
manua
1:.1
without
a wrench.
-
Mark the
nuts.
-
To prevent
turning
hold the
expansion
bolts
(1.10.01)
in place
by
means of a wrench and tighten
half
a turn.
-
Remove the
nuts
(1.10.08)
from the
retaining
bolts
(1.10.05)
one
by one.
Place
wibhc, . .l.1O.06)
anJ LViii~.·t·5sion sleeve
(1.10.07).
Hand-tighten
the
nut
(1.10.08)
to
sleeve
position
tighten
one
more
turn
without
wrench
and
lock
with
second
nut
(1.10.08).
Check dimension
E.
Install
the
cap
nuts
(1.10.04)
onto· the
ends
of
the
expansion
bolts
and secure
with
Loctite
blue.
--
Summary of Contents for SF6
Page 21: ...Fig 83 Exploded view of tle spring operating mechanism ...
Page 31: ...SF 1377 0 SF 1377 d SF 1377 0 SF 1377 0 SF 1377 _ 0 SF 1377 d SF 1377 0 SF 1377 0 ...
Page 32: ...SF 1377 c rUlUb m m I SF 1377 c J i SF 1377 SF 137 b 0 SF 1377 SF 1377 0 b ...
Page 33: ...BeruLub FK 33 Fig B8 Points of lubrication at the interrupter unit and at thE arcing contacts ...
Page 34: ...SF 1377 bl SF 1377 bl SF 1377 II 1 _ _ _ __ L i SF 1377 bl SF 1377 cl SF 1377 bl SF 1377 bl ...
Page 35: ...1 CLtl _ l1oLykote BR2 pLus l 0 ...
Page 38: ...2 7 17 2 7 18 2 7 16 2 7 02 2 7 18 2 7 03 2 7 01 2 7 06 2 7 11 2 7 07 2 7 22 ...