BA 418-12 * 1.0 * 418_12_4_4_Inbetriebnahme.fm
4-51
Putting into operation 4
Running-in period
Handle the vehicle
carefully during its first 100 operating hours
.
• Do not put a cold diesel engine under load.
- Let the diesel engine run at idling speed for about 3 minutes, then
slowly increase the engine speed.
• Avoid loading the diesel engine at idling speed.
• Do not run the diesel engine at high speed for extended periods.
• Increase the load gradually while varying the diesel engine speed
• Full travel speed (machine dynamics) is reached as soon as the
temperature of the drive reaches 20 – 50 °C (68 – 122 °F).
• Strictly observe maintenance schedules and perform (or have
performed) the specified maintenance
.
NOTICE
In order to achieve the maximum speed for vehicles with a high-speed
transmission (optional), the axles and gearbox must at least been run in
for 10 operating hours as well as have generally achieved a drive system
temperature of about 50°C (122°F).
Furthermore, maximum speed is only reached on level, asphalted ground,
with an empty bucket and without a trailer!
Summary of Contents for 418-12
Page 59: ...BA 418 12 1 0 418_12_3_Einleitung fm 3 27 Introduction 3 Right side of machine Fig 4 30 20 ...
Page 60: ...3 28 BA 418 12 1 0 418_12_3_Einleitung fm 3 Introduction Front of machine Fig 5 ...
Page 61: ...BA 418 12 1 0 418_12_3_Einleitung fm 3 29 Introduction 3 Rear of machine Fig 6 30 20 ...
Page 63: ...BA 418 12 1 0 418_12_3_Einleitung fm 3 31 Introduction 3 Outside right of the vehicle Fig 8 ...
Page 64: ...3 32 BA 418 12 1 0 418_12_3_Einleitung fm 3 Introduction Inside the cabin Fig 9 ...
Page 65: ...BA 418 12 1 0 418_12_3_Einleitung fm 3 33 Introduction 3 Engine compartment interior Fig 10 ...
Page 66: ...3 34 BA 418 12 1 0 418_12_3_Einleitung fm 3 Introduction Outside front of the vehicle Fig 11 ...
Page 67: ...BA 418 12 1 0 418_12_3_Einleitung fm 3 35 Introduction 3 Outside rear of the vehicle Fig 12 ...
Page 326: ...5 170 BA 418 12 1 0 418_12_5_Bedienung fm 5 Operation ...
Page 338: ...6 12 BA 418 12 1 0 418_12_6_Transport fm 6 Transport ...
Page 426: ...7 88 BA 418 12 1 0 418_12_7_Wartung fm 7 Maintenance ...
Page 462: ...8 36 BA 418 12 1 0 418_12_8_Betriebsstoerung fm 8 Malfunctions Notes ...
Page 499: ...BA 418 12 1 0 BA_418_12_V1_usSIX fm S 7 Index ...
Page 500: ...S 8 BA 418 12 1 0 BA_418_12_V1_usSIX fm Index ...
Page 527: ...FORM RTF 0907 Printed in U S A ...