Benchmark 2.0 LN Installation, Operation & Maintenance Manual
CHAPTER 3 – OPERATION
OMM-0046_0J
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
49
of
168
GF-123
Ph.: 800-526-0288
06/18/2015
Table 3-7. Relationship Between Air/Fuel Valve Position and Energy Input For Unit Running
On Natural Gas
Air/Fuel Valve Position
(% Open)
Energy Input
(BTU/Hr)
Boiler Energy Input
(% of Full Capacity)
0
0
0
10%
0
0
18%
(Stop Level)
100,000
5.0%
20%
134,000
7%
30%
349,000
17%
40%
631,000
32%
50%
893,000
45%
60%
1,150,000
58%
70%
1,410,000
71%
80%
1,610,000
81%
90%
1,830000
92%
100%
2,000,000
100%