BMK 750-3k Platinum Boiler OPERATION, SERVICE, and MAINTENANCE GUIDE
SECTION 2: OPERATION
Page
14
of
178
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0116_0A
03/15/2017
Ph.: 800-526-0288
GF-201
2.2 CONTROL PANEL DESCRIPTION
All Benchmark boilers utilize the C-More Control Panel shown in Figure 2-1. This panel contains
all of the controls, indicators and displays necessary to operate, adjust and troubleshoot the
boiler. These operating controls, indicators and displays are listed and described in Table 2-1.
Additional information on these items is provided in the individual operating procedures and
menu descriptions provided in this section.
Figure 2-1: Control Panel Front View
1
12
11
10
9
8
7
5
4
3
6
2