CONTROL PANEL OPERATING PROCEDURES
3-10
Table 3-6.
Relationship Between Air/Fuel Valve Position and Energy Input of a Unit Running on Natural Gas
Air/Fuel Valve
Position
(% Open)
Energy Input
(BTU/Hr)
Boiler Energy Input
(% of Full Capacity)
0
0
0
10
0
0
13
(Stop Level)
50,000
5 %
20
89,000
9%
30
191,000
19%
40
311.000
31%
50
460,000
46%
60
600,000
60%
70
699,000
70%
80
836,000
84%
90
955,000
96%
100
1,000,000
100%