MFC Series Boilers Installation Manual
Attaching the Stainless Steel 4th Pass to the Boiler - Continued
8. When the Stainless Steel 4th Pass is aligned inside the burner rim and level, install the nine
(9) bolts and washers as shown in Figures 7-5 and 7-6. Tighten bolts incrementally in cross
hatch pattern to ensure even tightness to a torque value of 10 to 20 ft-lbs.