43 / 56
TF7128_A_NOT_INST_DXR230_EXC_MB
Aereco S.A.
10.4. COMMISSIONING REGISTRATION FOR AERECO DX MODBUS EXCELLENCE
VISUAL INSTALLATION CHEKING
OK
NOK
Supply units are put in every main rooms (living room, bedroom)(accessibility)
Door relief vent (2 cm in the kitchen, 1 cm in every other rooms)
Exhaust units put in the utility rooms (toilet, bathroom, kitchen…) (accessibility)
Positioning of the defrosting in the fresh air duct (direction shown by the arrows)
Access hatch for the defrosting
Positioning and level of the DXA Unit (vertical) and fixation of the DXA Unit to the wall
Conformity of duct connection (direction shown by the arrows on the DXA Unit)
Flexible connection sleeve at the DXA Unit and airtightness of the connections
Exhaust air and fresh air duct (insulated and Ø160 mm)
Supply voltage 230V
Ground connections
RJ 12 and RJ 45 connections
Individual electrical connection for electrical device (defrosting, DXA Unit)
Check that the ducts are single or double according to the design sheet
Check that siphon or pump evacuation works properly (pipes are not stuck, and sealing is tight)
Duct connections are tight
RJ cable connections are <10m (cables cut to the min necessary length)
Extract compensation valve is installed in the right direction (arrow shows airflow direction)
Extract compensation valve is installed approx. at the same distance from DX unit as the furthest extract grill
The position of the presence and/or CO2 sensors is according to the installation guide
Extract compensation valve is accessible by hatch