45 / 56
TF7128_A_NOT_INST_DXR230_EXC_MB
Aereco S.A.
TESTS AND MEASUREMENTS:
OK
NOK
From the synoptic, in “Set BUS values”:
•
Test the compensation valve opening,
•
Test the HUB dampers opening, pipe by pipe.
•
Test the by-pass functioning (reading the T° on the synoptic)
Exhaust checking:
Measure each BXC airflow (must be registered in the commissioning document) and check measured airflow is compliant with
theorical airflow.
BXC1 max airflow
BXC2 max airflow
BXC 3 max airflow
BXC4 max airflow
Check the sum the amount exhaust airflow (full opened BXCs + Compensation valve) is compliant with the exhaust airflow
displays on the synoptic (+/- 20%).
Supply checking:
Measure each pipe airflow and check measured airflow is compliant with theorical airflow.
Pipe 1 max airflow
Pipe 2 max airflow
Pipe 3 max airflow
Pipe 4 max airflow
Pipe 5 max airflow
Pipe 6 max airflow
Pipe 7 max airflow
Pipe 8 max airflow
Check the sum the amount supply airflow (measured at the end of each supply pipe) is compliant with the supply airflow displays
on the synoptic (+/- 20%).