START-UP
Before starting, check the mounting of the fans on their chimney and the non-obstruction of the
duct (any object inside would cause a stress on the turbine)
Do not insert anything through them
Never turn on the fans if the electronic driving box is open
All the following operations must only be carried out once the electrical box is completely finished
(all the electrical connections must be completed)
Setting
Before starting, it is necessary to identify each fan group and to set each fan (that is to say, define its
operating speeds).
As a reminder, usually a fan group corresponds to a stack of dwellings.
1)
Identify each fan that you want to group together
and note the
group number in the insert "Gr" on each corresponding Fan module.
Important: a maximum of 5 groups are possible having each a
maximum of 5 fans.
Summary of Contents for VBP+
Page 11: ...11 36 Aereco S A ...
Page 13: ...13 36 Aereco S A Temperature sensor connection only ...
Page 14: ...14 36 Aereco S A Wind gauge connection only ...
Page 15: ...15 36 Aereco S A Clock connection only ...
Page 16: ...16 36 Aereco S A Temperature sensor wind gauge connection ...
Page 17: ...17 36 Aereco S A Temperature sensor clock connection ...
Page 35: ...35 36 Aereco S A ...