22.05 – 4037365_03
27
6
INSTALLATION
RECEIVING THE PRODUCT
Inspection upon receipt
To prevent damage during transport, the units are completely wrapped in packag-
ing and protected by plastic elements.
The machine is also wrapped in packaging. We recommend keeping this protection
during all transport and lifting operations and not remove the plastic elements until
commissioning.
There is a document envelope located inside the access panel to the electrical parts
that contains the following material:
— Instruction manual for the installer and the technical service, with the declara-
tion of conformity on the first pages
— Unit user manual
— Wiring diagrams
The instruction manual is an integral part of the unit and therefore it must be re-
covered, read and stored carefully. If lost, a copy can be found in the support area
online at www.aermec.com.
Upon receipt:
— Check that the exterior has not been damaged in any way;
— Check that the lifting and transport devices are appropriate to the type of
equipment and compliant with the transport and handling instructions at-
tached to this manual;
— Check that the accessories required for on-site installation have been delivered
and are operational;
— Check that the equipment supplied corresponds to the order and delivery note.
ATTENTION! If the product is damaged, send a registered letter with
the details of the problem to the shipping company within 48 work-
ing hours from delivery.
Product identification
Aermec products are identifiable by the
packaging label
that shows the product
identification data, and by the
rating plate
that shows the performance and iden-
tification technical data of the unit in your possession.
1
Technical plate
2
Motor data plate
3
Packaging label
When the unit is positioned, make sure that the rating plate is well visible as the
information provided on it is essential for correct maintenance.
PACKAGING HANDLING AND REMOVAL
Before carrying out the packaging removal or transport operations, put on personal
protective equipment and use devices and instruments suitable for the dimensions
and weigh of the equipment.
All handling operations must be performed by qualified personnel in strict compli-
ance with all the applicable safety procedures.
The handling operations must be carried out carefully to prevent damage. The unit
may only be handled in a horizontal position and only from its base.
It is prohibited to dispose of the packaging material in the environ-
ment or leave it within reach of children:
as it may be a potential source
of danger. Therefore it must be disposed of according to what is defined
by current laws.
The unit may be handled in two ways, using:
— A hoist or a crane;
— A forklift.
LIFTING WITH A HOIST OR CRANE
Before lifting the unit, place protections between the belts (or ropes and chains)
and the framework to prevent damage to the structure.
If handling with a hoist or crane, the unit is provided with holes in its
base (ø 2.6 in) through which poles (not supplied) are passed, only these
may be used for lifting.
Lifting with a hoist or crane for sizes from 0750 to 1250
The following is required:
— Follow all safety regulations and standards;
— Before lifting, check the specific weight on the technical plate;
— Wear safety glasses, work gloves and safety shoes;
— Pay the utmost attention to heavy and bulky equipment during lifting and han-
dling, and when placing it on the ground;
— All panels must be tightly fixed before moving the unit;
— Use all, and only, the lifting points indicated;
— Use ropes in compliance with Standards and of equal length;
— Use a spacer in accordance with the sling (not included) see drawing;
Summary of Contents for NLC 0280H
Page 2: ......