RECEIPT AND HANDLING
The machine is delivered from the factory wrapped in estincoil.
Before handling the unit, verify the lifting capacity of the machines used.
Handling must be performed by qualified, suitably equipped staff.
HANDLING THE MACCHINE
Whenever the machine must be lifted using belts, place protections
between the belts and the framework to prevent damage to the structure.
The NYB units are supplied with eyebolts; they must be lifted using
suitable straps hooked to all the installed eyebolts.
LIFTING STANDARDS
- All panels must be tightly fixed before moving the unit;
- Before lifting, check the specific weight on the technical plate.
- Use all, the lifting points indicated,Only use the lifting point indicated
by the appropriate labels, and always use all the lifting points.
- Use ropes in compliance with Standards and of equal length;
- Use a spacer beam in compliance with Standards (not included)
- Handle the unit with care and without sudden movements.
- The machine must always be kept in a vertical position;
■
WARNING: The units cannot be stacked.
SELECTION ON THE PLACE OF INSTALLATION
The chiller is shipped already tested and only requires electrical and
hydraulic connections in the installation site.
Before beginning the installation process, decide with the client where
the unit is to be installed, whilst paying attention to the following:
- The support surface must withstand the weight of the unit.
- The safety distances between the units and other appliances or
structures must be scrupulously respected.
- The unit must be installed by a qualified technician in compliance with
national laws in the country of destination.
- It is mandatory to foresee the necessary technical space in order to
allow ROUTINE AND EXTRAORDINARY MAINTENANCE interventions.
- Remember that during operation, the chiller can cause vibrations;
therefore, anti-vibration supports are recommended, fastened to the
base according to the assembly layout.
- Fix the unit checking that it is level.
WARNING: The units cannot be stacked.
WARNING:
•
It is prohibited to stop under the unit during lifting operations.
•
The units cannot be stacked.
•
The unit must be installed in order to make possible the maintenance and
/ or repair.
Ø50mm
WARNING: Lifting bars are NOT
provided. Don’t use after lifting point
except for that present.
02.0 in
Accessory
Height
Widht
Length
CRATE_NYB
in
100.3
53.0
92.8
If accessory CRATE is included:
Summary of Contents for NYB
Page 2: ......