SECTION 4
„AERO” Sp. z o. o.
NORMAL PROCEDURES
AT-3 R100
Page 4-2
SEPTEMBER, 2004
AEROPLANE FLIGHT MANUAL
4.1. Introduction
Section 4 contains the list of inspection tasks and detailed procedures for
normal aeroplane operation with standard equipment installed. Normal
procedures concerning the optional equipment or systems are contained
in Section 9.
4.2. Rigging and de-rigging the aeroplane
If de-rigging the aeroplane and preparation for transportation is
necessary, refer to Aeroplane Maintenance Manual of AT-3 R100
Aeroplane, Section 2.6 – Transport of the de-rigged Aeroplane
4.3. Daily pre-flight and post-flight inspection
Recommended daily pre-flight inspection:
- Check amount of fuel, oil and engine coolant
- Check for leaks of oil, fuel and coolant.
- Drain fuel sediment
- Check condition of exhaust pipes.
- Check condition of nose and main landing gear:
- condition of the tyres,
- tyre pressure, (visually)
- condition of rubber shock absorber of the nose landing gear.
- Check condition of engine cowling, its locking and securing.
- Visually check propeller blades are clean and in good condition.
- Visually check the cockpit canopy is clean.
- Check the canopy for correct opening and locking.
- Check the inspection holes in the fuselage and wing are closed and
locked.