PowerLock
™
FOR GRAIN TRAILERS
17
Installation Instructions
Step 5
Installing Roll Stops and Secure Anchor Pipe
1)
Place tarp on trailer body and center on caps.
2) Figure 41.
Locate fi rst roll stop bracket 4"-8" from end of
anchor pipe and 1" down from top rail.
3a) Figure 42.
Drill a pilot hole and attach with 3/8 x 1 type
F HWH bolts.
3b) Figures 42 & 43.
Drill a pilot hole and attach with 3/8
x 2-1/2 carriage bolts.
4)
Locate last roll stop bracket 4"-8" from end of anchor pipe
or as close as possible and 1" down from top rail.
5)
Evenly space roll stop brackets along top rail with maximum
of 96" apart.
6)
Place anchor pipe into roll stop and assemble roll stop.
Roll
Stop
Bracket
4" - 8”
as close as possible
each end
1"
Figure 41
Install Anchor Pipe & Roll
Stops to Sideboards
Install Anchor Pipe to Top Rail
& Roll Stops to Sideboards
Hardware to Mount to Sideboards
Index Description
1
5/16 X 2-1/2 CARRIAGE BOLT
2
5/16 FLAT WASHER
3
5/16 LOCK WASHER
4
5/16 HEX NUT
5
1/8" x 1" x 12' FLAT ALUMINUM
6
SCREW #14 X 1 HWH AB ZINC
7
CLAMP, ANCHOR PIPE
8
3/8 X 1 TYPE F HWH BOLT
Figure 42
Figure 43