SN
10
lo
n
g
si
d
e
Assembly
www.aerocompact.com
18
Place rail lines
Align the rail lines with the selected grid.
Install ballast
Depending on the circumstances, the system is ballasted differently.
Variation 1: Ballasting on the base rail
With this ballasting variation, the ballast blocks are mounted directly on the base rails. Up to 3 ballast blocks
can be fixed with one ballast clamp. The ballast blocks can be mounted in front and/or behind the back sup-
port.
Take the exact number and position of the ballast blocks from the AEROTOOL planning documents.
Ballast in front of the back support (under the module)
Attach the ballast clamp to the base rail.
Place the ballast blocks
on the base rail flush with the back support.
Align the ballast clamp and place the ballast block
.
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+