SN
10
p
lu
s
lo
n
g
si
d
e
Assembly
www.aerocompact.com
20
When ballast rails follow each other:
Lay out the ballast rails so that they overlap at the supports.
Hand tighten the ballast rails to the base rail.
Tighten the screws to 10 Nm or 7.38 ft lb with a torque wrench.
Lay out ballast blocks according to Aerotool planning documents.
Variant 3: Ballast tray
The ballast trays can be mounted in the following positions:
behind the first front support (under module)
in front of the first back support (under module)
behind the second back support (under module)
in front of the second front support (under module)
behind the second front support
Refer to the Aerotool planning documents for the exact number and position of the ballast trays.
Align BT-2050 and BT-1800 ballast trays
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+