MAINTENANCE MANUAL
AMT 200S
SECTION:1
MM - 200-25
11.2
Main Landing Gear Rigging
11.2.1 Put the aircraft on jacks
11.2.2 Landing Gear Up-Lock Rigging (See Figure below)
(a)
Retract the landing gear
(b)
Adjust the length of the link rod (1) on the rod ends until you obtain an effective
landing gear uplock
(c)
Extend and retract the landing gear several times.
Note:
Do the procedure above for the two main gears.
1- Link rod
5- Control Arm
2- Compensation Spring
6- Stop screw
3- Rod
7- Landing gear leg (fixed strut)
4- Crank
8- Wing spar
Page 1.36
August 10, 2004 - Rev. 8
Summary of Contents for AMT 200S SUPER XIMANGO S
Page 1: ...200 25 MAINTENANCE MANUAL AMT 200S...
Page 20: ...MAINTENANCEMANUAL AMT 200S SECTION 1 MM 200 25 Brake System Page 1 19 August 10 2004 Rev 8...
Page 24: ...MAINTENANCEMANUAL AMT 200S SECTION 1 MM 200 25 AileronControls Page 1 23 August 10 2004 Rev 8...
Page 26: ...MAINTENANCEMANUAL AMT 200S SECTION 1 MM 200 25 ElevatorControl Page 1 25 August 10 2004 Rev 8...
Page 28: ...MAINTENANCEMANUAL AMT 200S SECTION 1 MM 200 25 RudderControl Page 1 27 August 10 2004 Rev 8...