background image

 

MANUFACTURER 

RECOMMENDATION 

DV WT9 10B / 2019, Rev. 0 

Sheet: 

Sheets: 


10

 

 

2. 

Installation of new canopy lock socket. 

2.1. 

Put the insulation (6, Fig. 3) on the cable (5), solder the wires (4, 5) according to wiring diagram  
(Fig. 10). 

2.2. 

Place the insulation (6, Fig. 3) on the joint and apply heat to shrink it. 

2.3. 

Pass  the  cable  (7,  Fig.  4)  to  the  right  through  the  fuselage  stiffener  and  central  tunnel  
to the instrument panel. 

2.4. 

From  the  rear drill  the hole  in  the fuselage  stiffener for  access  to  adjusting  screw  (10,  Fig. 5)  
of sensor. 

2.5. 

Place  the  canopy  lock  socket  (1,  Fig.  3)  into  the  fuselage  (2)  and  attach  it  by  rivets  (3)  
(see Fig. 7)

2.6. 

Fix the cable (7, Fig. 4) to the fuselage and other electrical installation by means of clips (8) and 
cable ties (9). 

2.7. 

Connect the cable (7) to the check lamp and circuit breaker according to wiring diagram (Fig. 10). 

2.8. 

Bond  the  protective  plate  (11,  Fig.  7)  on  the  canopy  frame  (12)  using  Araldite  2022-1  
in the position according to main latch (13). 

 

 

Fig. 3 

 

 


 

Summary of Contents for WT-9 Dynamic

Page 1: ...ligible Moment change Negligible REQUIRED ACTION Install new canopy lock with safety latch and sensor that minimize the risk of canopy opening during flight by two ways Indication of insufficient plug...

Page 2: ...opy lock socket 2 from the fuselage 1 2 Place the template Fig 2 for installation hole enlarging on the fuselage and align with the rivet holes template in the scale 1 1 is in the Appendix 1 UP symbol...

Page 3: ...he instrument panel 2 4 From the rear drill the hole in the fuselage stiffener for access to adjusting screw 10 Fig 5 of sensor 2 5 Place the canopy lock socket 1 Fig 3 into the fuselage 2 and attach...

Page 4: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 4 10 Fig 4 Fig 5 7 8 8 10 9 9...

Page 5: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 5 10 Fig 6 Fig 7 1 3 12 13 11...

Page 6: ...ect the sensor of canopy lock socket to the check lamp and circuit breaker according to wiring diagram Fig 10 3 1 3 Install the check lamp and circuit breaker on the instrument panel 3 1 4 Mark the ch...

Page 7: ...to the reference position i e closely to the entry hole of canopy lock socket 6 4 3 Plug in the main latch 10 5 0 3 mm deep into the canopy lock socket 12 and fix it in this position 4 4 By means of a...

Page 8: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 8 10 5 Wiring diagram Fig 10...

Page 9: ...131 24 0 2 Cable 3 wire T 0 24 6 m 44A0111 22 9 Cable 1 wire 0 38 2 m DB 6 63 FASTIN AWG 16 14 DURASEAL B 106 4632 1 pc DR 6 40 Cable eye 4 6 4 3 DURASEAL B 106 1402 1 pc DR 6 50 Cable eye 4 6 5 3 DUR...

Page 10: ......

Reviews: