background image

 

MANUFACTURER 

RECOMMENDATION 

DV WT9 10B / 2019, Rev. 0 

Sheet: 

Sheets: 


10

 

 

NECESSARY MATERIAL: 

Material:  

DVWT9-10B-A

 

Variant A (individual check lamp), price on request 

 

 

 

or 

 

 

 

DVWT9-10B-B

 

Variant B (check lamps panel), price on request 

Work time:  

Max. 8 hours. 

 

Material for Variant A (individual check lamp): 

Order No. 

Item 

Quantity 

DVWT9-10B-A 

Material DV WT9 10B 

– Variant A 

1 set 

 

Set DVWT9-10B-A contains: 

Item No. 

Item 

Quantity 

DYN-130-20-2 

Canopy lock socket 2 

1 pc 

103440161 

Rivet 4X16 / DIN7337B 4X16 AL/ST A1P 

4 pcs 

44A1131-24-0-2 

Cable 3-wire T 0,24 

6 m 

44A0111-22-9 

Cable 1-wire 0,38 

2 m 

DB-6-63 

FASTIN AWG 16-14 / DURASEAL B-106-4632 

1 pc 

DR-6-40 

Cable eye 4,6-4,3 / DURASEAL B-106-1402 

1 pc 

DR-6-50 

Cable eye 4,6-5,3 / DURASEAL B-106-1502-S 

1 pc 

1-275 

Yellow check lamp / ELECO SMS95 Y 12DC 
P30 

1 pc 

1-230 

Rectifier diode / SMD 200V 1.1V 1A 

1 pc 

DYN-125-21 

Logic convertor 

1 pc 

1-010 

Circuit breaker 1A / ETA 106-P10-1A 

1 pc 

A055700075 

Rivet / WEIDMULLER 9019040000 

2 pcs 

1-225 

Cable tie 2,5x135 / B.A.CH RT-304UV 

50 pcs 

06832 

Clip 19x19 / HILPRESS 06832 

4 pcs 

801910 

Shrink tube / POS 19,0-9,5 black 

0.1 m 

4914000C 

Shrink tube / POS 6,4-3,2 white 

0.1 m 

E37.95.032 

Shrink tube / POS 3,2-1,6 black 

0.1 m 

Label “CANOPY“ 

2 pcs 

Template 

1 pc 

 

Summary of Contents for WT-9 Dynamic

Page 1: ...ligible Moment change Negligible REQUIRED ACTION Install new canopy lock with safety latch and sensor that minimize the risk of canopy opening during flight by two ways Indication of insufficient plug...

Page 2: ...opy lock socket 2 from the fuselage 1 2 Place the template Fig 2 for installation hole enlarging on the fuselage and align with the rivet holes template in the scale 1 1 is in the Appendix 1 UP symbol...

Page 3: ...he instrument panel 2 4 From the rear drill the hole in the fuselage stiffener for access to adjusting screw 10 Fig 5 of sensor 2 5 Place the canopy lock socket 1 Fig 3 into the fuselage 2 and attach...

Page 4: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 4 10 Fig 4 Fig 5 7 8 8 10 9 9...

Page 5: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 5 10 Fig 6 Fig 7 1 3 12 13 11...

Page 6: ...ect the sensor of canopy lock socket to the check lamp and circuit breaker according to wiring diagram Fig 10 3 1 3 Install the check lamp and circuit breaker on the instrument panel 3 1 4 Mark the ch...

Page 7: ...to the reference position i e closely to the entry hole of canopy lock socket 6 4 3 Plug in the main latch 10 5 0 3 mm deep into the canopy lock socket 12 and fix it in this position 4 4 By means of a...

Page 8: ...MANUFACTURER RECOMMENDATION DV WT9 10B 2019 Rev 0 Sheet Sheets 8 10 5 Wiring diagram Fig 10...

Page 9: ...131 24 0 2 Cable 3 wire T 0 24 6 m 44A0111 22 9 Cable 1 wire 0 38 2 m DB 6 63 FASTIN AWG 16 14 DURASEAL B 106 4632 1 pc DR 6 40 Cable eye 4 6 4 3 DURASEAL B 106 1402 1 pc DR 6 50 Cable eye 4 6 5 3 DUR...

Page 10: ......

Reviews: