7.2 Preparatory activities for commissioning
An insulation test must be carried out before the telescope spindle axis is put
into operation!
7.3 Commissioning of the modules
Proceed carefully and follow the instructions step by step when commissioning
the modules for the first time:
1. Switch off the controller.
2. Connect the encoder cable.
3. Connect the motor cable.
4. Connect the reference switch cable.
5. Switch on the controller unit and check the correct function of the encoder
and the reference switch.
6. Perform test run:
- Start with slow movements
- Then continue under normal operating conditions.
Commissioning is completed.
CAUTION
Danger due to missing protective devices!
Operating the telescope spindle axis without suitable safety devices can lead
to considerable damage to property and injuries.
Protective covers, safety doors or other safety devices must be provided by
the user for operation!
These safety devices must comply with the usual safety guidelines and
safety standards and suitably prevent people from being in the working area
of the telescope spindle axis.
As a matter of principle, the telescope spindle axis may only be put into
operation with closed and functioning protective devices!
Summary of Contents for 50113773
Page 54: ...54 56 Assembly instructions EN SA 3 I SA 3 FL I SA 6 I SA 6 FL Edition 01 2021 Rev 4 5 ...
Page 55: ...Assembly instructions EN SA 3 I SA 3 FL I SA 6 I SA 6 FL Edition 01 2021 Rev 4 5 55 56 ...
Page 56: ...56 56 Assembly instructions EN SA 3 I SA 3 FL I SA 6 I SA 6 FL Edition 01 2021 Rev 4 5 ...