Moving the Tower
Moving the tower is strictly NOT Permissible. If required,
dismantle and re-assemble again.
Comply To
Independently tested for use.
Compliant to 3T Assembly process.
Safe working load on the platform is 200kgs/Sq Mtr, evenly distributed.
Maximum permissible distributed load on the tower 600 Kgs.
Type Approval
The scaffold towers referred to herein have been tested by
20
STABILIZERS
MAST620_AM-3T_V3.0