Maximum Safe Working Loads

The safe working load of the tower is 

750 kgs

 including its own weight. The 

maximum safe working load of any individual platform is 

250 kgs

 evenly 

distributed. If the tower is to be used in an application outside the scope of 

EN1004

, contact your supplier or the manufacturer, Affix Scaffolding WLL, 

for advice on loadings.

Tel: +974 5529 9893 or Email: info@affixscaffolding.com.

RECOMMENDATIONS :

Recommend a minimum of two people to assemble, dismantle and move the platform tower.
Check that all components are on site and in good working order.

Towers must always be climbed from the inside of the assembly using the ladder.
Lifting of components must be done inside the effective base area of the tower.
Moving the tower must only be done by manual effect from the base of the tower.
When moving tower be aware of overhead hazards (e.g. electric cables). 

No personnel or material to be on the platform whilst the tower is being moved.

Damaged components or components from other tower systems must never be used.
Stabilizers should always be fitted when specified. Use the stabilizer shown on the component

list according to the tower height.

Outdoor scaffold towers should, wherever possible, be secured to a building or fixed structure.

It is good practice to tie scaffold towers of any height, especially when unattended, or exposed to

windy conditions.
Do Not use boxes or steps to gain additional height.
Do Not lift or suspend an assembled mobile tower.

Beware of horizontal loads which can lead to instability of the tower. The Max. side force is 20kg. 

Ensure that the assembly location is checked to prevent hazards during assembly or moving

and while working on the tower. Particular attention should be given to the ground condition,

whether level or sloping, obstructions and wind conditions. The ground condition must be 

capable of supporting the tower structure. 

03

USAGE ADVICE

Summary of Contents for MADW 1020-AGR

Page 1: ...Assembly Manual Double Width MADW AGR Series EN1004 1 Class 3 No CE 21 22 044...

Page 2: ...access tower manufactured in our ISO 9001 accredited facility This user guide provides you with step by step instructions to ensure your system is assembled easily and safely using the AGR Advanced Gu...

Page 3: ...required height Compliances The Affix MADW Mobile Tower has been tested and certified to EN1004 1 2020 by TUV India The Affix MADW Series Mobile Tower are versatile and user friendly aerial solution...

Page 4: ...ards e g electric cables No personnel or material to be on the platform whilst the tower is being moved Damaged components or components from other tower systems must never be used Stabilizers should...

Page 5: ...raises dust Gale force cannot even walk Raises loose papers leaves and small twigs move Strong breeze tree branches bend unable to use umbrella 3 4 5 6 Description Air Speed Action to be taken Ensure...

Page 6: ...triggers in the bracing hooks such that they are working properly Lock the castor by moving the brake lever fully down Sort the braces into horizontal and diagonal braces the diagonals are slightly l...

Page 7: ...ame and 2 Rung Span Frame Step 2 1 Step 2 1 Hook both the bottom 2 Horizontal Braces horizontally to the Span frame and the Ladder Frame s vertical pipes just above the 1st rung Step 2 2 Step 2 2 Lock...

Page 8: ...the 1st level Span frame at one end and the other end should be hooked to the 1st Rung of the 2nd level Ladder frame Step 4 2 Step 4 2 Hook the 2nd Diagonal Brace to the 1st Rung of the 2nd level Lad...

Page 9: ...e hooked to the 1st rung of the 2nd level frames Step 5 2 Repeat Step 5 1 for the opposite side but slide it towards the frame ladders to provide cover to the platform Step 6 Step 5 Clamp the 4 Stabil...

Page 10: ...frames Make sure the trapdoor is towards the ladder side 09 ASSEMBLY Step 7 1 Step 7 1 Insert both the 3rd level 4 Rung Span Frame and the 4 Rung Ladder Frame on the respective sides into the correspo...

Page 11: ...t Rung of the 3rd level Ladder frame Hook the 2nd Diagonal Brace to the 3rd Rung of the 2nd level Ladder frame at one end and the other end should be hooked to the 1st Rung of the 3rd level Span frame...

Page 12: ...ide Also hook the Fixed platform beside the Trapdoor platform on the same rungs Step 12 1 Step 12 1 Step 12 Step 12 2 Step 12 2 Clamp the 4 plastic toe board holders on all the 4 corners of the workin...

Page 13: ...ert the Side Toeboard and the End Toeboard in the respective toeboard slots as shown in the figure Clamping Instructions Always ensure the Spring Clips are in the lock position after inserting the upp...

Page 14: ...13 COMPONENTS FS20135 Span Frame FS10135 Span Frame BT200 250 ToeBoard Set FL10135 Ladder Frame FL20135 Ladder Frame CW150 200 JA500 Castor Wheel Adjustable Jack...

Page 15: ...PF200 250 Fixed Platform PT200 250 Trapdoor Platform ST200 300 450 600 Stabilizer BD200 250 BH200 250 Diagonal Brace Horizontal Brace 14 COMPONENTS AGR200 250 Advanced Guard Rail...

Page 16: ...Position the stabilizers so that the footpads are approximately equidistant from each other Adjust the stabilizers and reposition the clamps as required to make firm contact with the ground When in co...

Page 17: ...prepare the tower for use Check that the tower is vertical Reapply the castor brakes Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with the ground Carefully m...

Page 18: ...der Frame Mini Span Frame Mini 4 0 4 0 2 0 0 0 1 1 1 1 1 1 4 0 4 2 2 0 0 0 1 1 1 1 2 2 0 0 0 4 4 2 4 4 0 0 2 1 1 2 2 1 1 0 4 4 2 4 4 0 0 2 1 1 3 3 0 0 0 4 4 2 6 4 0 0 3 1 1 3 3 1 1 0 4 4 2 6 0 4 0 3 1...

Page 19: ...EN1004 1 Certification by TUV India 18...

Page 20: ...affixscaffoldin https www linkedin com company affix scaffolding llc https www linkedin com company affix scaffolding llc https qrco de bcPyx6 To Check Assembly Video SCAN ME PO Box No 201633 Doha Qa...

Reviews: