Step 5.1
Step 5.1
Hook the top rung of the
AGR frame
to
the top rung of the 2nd level frames and
the bottom rung of the
AGR frame
should
be hooked to the 1st rung of the 2nd level
frames.
Step 5.2
Repeat Step 5.1 for the opposite side but
slide it towards the frame ladders to
provide cover to the platform.
Step 6
Step 5
Clamp the 4 Stabilizers on all 4 corners
as per the
Components Table on Page
no. 17.
For detailed instructions on
installation refer to
Page no.15.
08
ASSEMBLY