WARNING
NEVER FORGET TO TIE
THE STRUCTURE
DESCRIPTION:
Through The Trapdoor (3T) Method:
The
3T
method of construction is an approved method of assembly and it minimizes the risk of
a fall from height. The erector can complete an ‘assembly or access’ platform level from which
the ‘next lift’ of frames, braces and platform is added, until the final working height of the tower
is achieved. By following the
3T
method, the erector sits through the hatch of the platform with
their feet resting on the frame rungs. In this position the erector can attach the guardrail braces.
Once guard-rails are secured in position the erector can climb onto the platform and continue
constructing the next level.
Compliances:
The Affix
MALT Linked Tower
structure has been tested and certified to
BS1139-6: 2014
by
TUV,
India
The Affix
MALT
Series Aluminium Linked Tower offers customer the flexibility to work on the
long span platform of
7.5 Mtrs Length
together by joining two
Double Width Towers
together
through and additional platform at multiple levels. The
MALT Series
towers allow the user to
work on longer platform with more workers to work simultaneously. This tower is ideal for use
when work is required to be at multiple levels simultaneously.
The information and instructions included in this manual are provided to help get the best
possible service from your
MALT
Series Aluminium Linked Tower. This user guide provides you
with step by step instructions to ensure your system is assembled easily and safely, using the
3T (Through the Trapdoor) method.
02